Schwarz IT Data Center DC 10, Ostermiething, Austria

Schwarz IT Data Center DC 10 - has installed four GEA BluAstrum ammonia chillers.

The 1,500 square-meter data center. Each rack can draw up to 20 kW of electrical power

The data center has four GEA BluAstrum ammonia chillers installed to serve as a backup for the natural cooling system.

Four GEA BluAstrum chillers stand ready to cool the data center when the river water cooling system is unavailable

Four GEA BluAstrum chillers stand ready to cool the data center when the river water cooling system is unavailable

GEA BluAstrum

GEA BluAstrum: Cooling with natural refrigerant

Recibir noticias de GEA

Mantente al día de las innovaciones e historias de GEA suscribiéndote a las noticias GEA.

Contacte con nosotros

¡Estamos aquí para ayudar! Con solo un poco de información podremos responder tu consulta.