Depending on the availability of a spare ECM and peripherals, a press can be up and running again within 2 hours, boosting productivity. The peripheral equipment can be cleaned using the same WOL principle. I will discuss the use of split butterfly valves, contained manual and automated sampling, deduster metal check units and tablet collection.
Sign up to news from GEA