奥地利,奥斯特米廷,Schwarz IT 数据中心 DC 10

Schwarz IT 数据中心 DC 10 - 安装了四台 GEA BluAstrum 氨制冷机组。

The 1,500 square-meter data center. Each rack can draw up to 20 kW of electrical power

The data center has four GEA BluAstrum ammonia chillers installed to serve as a backup for the natural cooling system.

Four GEA BluAstrum chillers stand ready to cool the data center when the river water cooling system is unavailable

Four GEA BluAstrum chillers stand ready to cool the data center when the river water cooling system is unavailable

GEA BluAstrum

GEA BluAstrum: Cooling with natural refrigerant

接收 GEA 新闻

订阅 GEA 的新闻,掌握 GEA 的创新信息和故事。

联系我们

我们随时为您提供帮助!您只需提供少量详细信息,我们就能回复您的查询。