业务新闻

GEA bundles and modernizes spare parts supply in new logistics center

12 Jul 2023

A new logistics center is currently being built in Sehnde near Hanover, Germany, for the supply of spare parts for all plants and components of GEA's Separation & Flow Technologies Division (SFT). Together with the new partner Kuehne Nagel, the focus is on state-of-the-art automated storage systems, maximum flexibility and sustainability. The logistics center is scheduled to open in the second quarter of 2024. The spare parts portfolio will be gradually relocated from other European sites to Sehnde over the coming year.

Picture: A modern logistics center is currently being built in Sehnde near Hanover to supply spare parts for all plants and components of the GEA Separation & Flow Technologies Division. (Source: E Group/Wolfgang Helm Photography)

A modern logistics center is currently being built in Sehnde near Hanover to supply spare parts for all plants and components of the GEA Separation & Flow Technologies Division. (Source: E Group/Wolfgang Helm Photography)

With the new logistics center, GEA is bundling all spare parts logistics for the SFT division. The new building with a total area of approx. 22,000 m2 is a multi-user warehouse in which GEA can expand if required. Environmentally friendly operation is ensured, among other things, by a large-scale photovoltaic system and a future-proof heat pump system. State-of-the-art IT systems and robot-assisted warehouse automation enable orders to be processed quickly and precisely.

Higher customer satisfaction and strengthening of competitive position

"With the new logistics center, we will be able to supply our customers with spare parts highly efficiently in the future. Integration, automation, scalability and new digital services lay the foundation for future growth and innovation," explains Dr. Andreas Seeringer, Chief Service Officer of GEA Division SFT. "We are pleased to have found a suitable partner in Kuehne+Nagel, who will realize this project with us according to the latest standards in warehouse technology and sustainability."

Like GEA, Kuehne+Nagel is also striving for ambitious climate targets. "With the new logistics center, we are living up to our joint commitment to reduce CO₂ emissions. As a pioneer in the logistics industry, it is particularly important for us to make our contribution on the way to a carbon-free future," explains Axel Krichel, member of the Kuehne+Nagel management team in Germany and responsible for the contract logistics business unit.

Therefore, the logistics center is mainly supplied with green electricity, part of which comes from the company's own photovoltaic system. The surplus is available via charging columns for e-cars. Heat for the respective office, recreation and social rooms is generated via an air-to-water heat pump. In addition, the greening of the facade and roof is planned.

Further synergy effects

The centralization also results in the synergy effect that the individual customer orders are processed in a consolidated manner via the plant. This is because an industrial production plant often operates not only a single machine, but also other components from GEA. This bundling reduces transport costs as well as delivery routes, thus saving further tons of CO₂.

Contact

Lilian Schmalenstroer

Phone: 49 211 91362090

About GEA

GEA 是食品加工行业及众多工业领域的领先供应商之一,2019 年的销售总额约达 49 亿欧元。

作为国际技术集团,我们专注于机械制造,生产运营,工艺技术及其设备组件。 GEA 为各种终端用户市场的复杂生产流程提供可持续的能源解决方案,并提供全面的服务组合。集团在长期持续增长的食品和饮料行业的收入约占其总收入的 70%。截至 2018 年 12 月 31 日,集团的全球员工已超过 18,500 人。GEA 在其业务领域中是市场和技术领导者。GEA 是德国 MDAX 上市公司(G1A,WKN 660 200),拥有 STOXX® Europe 600 指数和优选的 MSCI 全球可持续发展指数。
接收 GEA 新闻

订阅 GEA 的新闻,掌握 GEA 的创新信息和故事。

联系我们

我们随时为您提供帮助!您只需提供少量详细信息,我们就能回复您的查询。