Overview
For the recovery of crude oil from bitumen
The system can be used on land-based installations or offshore fixed and floating production systems. All necessary components are mounted on the self-supporting frame. The skid and associated support structures are designed for single point lift and transport. The skid itself is provided with four lifting lugs to facilitate lifting. A carbon steel drip pan with drain connection is incorporated in the skid.
The complete system is tested in our test bay before delivery and therefore on-site assembly and commissioning work is reduced. Depending on the required flow rate and performance as well as for stand-by function a number of systems in parallel operation can be considered
Rated capacity up to 250 m3 / h / 37,700 BPD
La planta de GEA en Koszalin, Polonia, marca un hito en la producción de bombas higiénicas. Este centro polivalente combina décadas de experiencia alemana en ingeniería con una digitalización avanzada y soluciones escalables....