Overview
For the recovery of crude oil from bitumen
The system can be used on land-based installations or offshore fixed and floating production systems. All necessary components are mounted on the self-supporting frame. The skid and associated support structures are designed for single point lift and transport. The skid itself is provided with four lifting lugs to facilitate lifting. A carbon steel drip pan with drain connection is incorporated in the skid.
The complete system is tested in our test bay before delivery and therefore on-site assembly and commissioning work is reduced. Depending on the required flow rate and performance as well as for stand-by function a number of systems in parallel operation can be considered
Rated capacity up to 250 m3 / h / 37,700 BPD
To support community engagement, GEA offers employees one day of paid time off per year.
How do you lead a dairy farm into the next generation while ensuring a sustainable future and animal welfare while managing increasing complexity? This is a question almost every dairy farmer around the world must consider. The...
After reaching its Mission 26 targets two years early, GEA launches Mission 2030 strategy with focus on growth, value and making a positive impact.